The school has a large MUGA and a Netball Court. The netball court was re-surfaced due to a drainage problem so to resolve this full ACO drainage system was installed following the existing falls of the court to stop water from laying on the court in the future. The MUGU received a full rejuvenation of the synthetic surface to help with drainage, lifting the Astro pile to make for a better playing experience.